Monthly Archives: July 2013

Tower Building Part 2

Posted by & filed under , .

So the next part in my project is to build the rebar cage that goes inside the concrete base.  Based on the specs in the Trylon drawing there should be 20 Vertical bars and 5 horizontal bars. I ordered my stuff from AGF Raymond here in Ottawa.  Sent them the drawings and they bent all […]

Tower Building Part 1

Posted by & filed under , .

Finally I got the tower project started. I have a Trylon Titan T400-72  This is a 9 section freestanding tower.  It requires a minimum of 6 cubic yards of concrete with a rebar cage on the inside to reinforce the block. I’ll be adding a 4″ conduit that will route the cable from the tower […]