Posts Tagged: T400

Tower Building Part 2

Posted by & filed under , .

So the next part in my project is to build the rebar cage that goes inside the concrete base.  Based on the specs in the Trylon drawing there should be 20 Vertical bars and 5 horizontal bars. I ordered my stuff from AGF Raymond here in Ottawa.  Sent them the drawings and they bent all […]